We installed 2 small systems each 2.46 kw to comply with title 24. The permitting process when it comes to ADU can be challenging because sometimes the ADU don’t have a registered address and connecting the system to the grid will take longer. The project was successful took us all day but we got it done.
Save Up to $1200 – with Home Efficiency Federal Tax Rebate!